7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityWatch

63th national percentile — 5.3% high-severity citations

ChronicityWatch

50th national percentile — 4 repeat citations

Staffing integrityClean

None on file

Fire safetyElevated

11 citations

Weekend staffing dropLow

25th national percentile — 12.3%

Contract staff shareElevated

92th national percentile — 18.6%

Clinical trendElevated

70th national percentile — 2/5 measures worsened

Staffing gapElevated

Reported 3.70 vs expected 4.27 · −0.57 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

19 citations on file
F-0600
G
Protect each resident from all types of abuse such as physical, mental, …
Actual Harm

Protect each resident from all types of abuse such as physical, mental, sexual abuse, physical punishment, and neglect by anybody.

Survey date: Mar 6, 2026 · Isolated — actual harm
F-0627
D
Ensure the transfer/discharge meets the resident's needs/preferences and…
Minimal Harm

Ensure the transfer/discharge meets the resident's needs/preferences and that the resident is prepared for a safe transfer/discharge.

Survey date: Mar 6, 2026 · Isolated — no actual harm with potential for more
F-0604
D
Ensure that each resident is free from the use of physical restraints, u…
Minimal Harm

Ensure that each resident is free from the use of physical restraints, unless needed for medical treatment.

Survey date: Dec 19, 2025 · Isolated — no actual harm with potential for more
F-0656
E
Develop and implement a complete care plan that meets all the resident's…
Potential Harm

Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured.

Survey date: Dec 19, 2025 · Pattern — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

11 citations on file
F-0029
F
Develop a communication plan
Potential Harm

Develop a communication plan.

Survey date: Dec 19, 2025 · Widespread — no actual harm with potential for more
F-0037
F
Establish staff and initial training requirements
Potential Harm

Establish staff and initial training requirements.

Survey date: Dec 19, 2025 · Widespread — no actual harm with potential for more
F-0271
E
Have exits that are accessible at all times
Potential Harm

Have exits that are accessible at all times.

Survey date: Dec 19, 2025 · Pattern — no actual harm with potential for more
F-0281
F
Install proper backup exit lighting
Potential Harm

Install proper backup exit lighting.

Survey date: Dec 19, 2025 · Widespread — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list

No other facilities with a lower realrating.care composite risk score in this radius.