7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityElevated

77th national percentile — 8.7% high-severity citations

ChronicityModerate

39th national percentile — 4 repeat citations

Staffing integrityClean

None on file

Fire safetyElevated

9 citations

Weekend staffing dropElevated

71th national percentile — 18.4%

Contract staff shareElevated

95th national percentile — 24.1%

Clinical trendLow

10th national percentile — 0/5 measures worsened

Staffing gapModerate

Reported 4.64 vs expected 4.72 · −0.08 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

23 citations on file
F-0628
D
Provide the required documentation or notification related to the reside…
Minimal Harm

Provide the required documentation or notification related to the resident's needs, appeal rights, or bed-hold policies.

Survey date: Mar 26, 2026 · Isolated — no actual harm with potential for more
F-0641
D
Ensure each resident receives an accurate assessment
Minimal Harm

Ensure each resident receives an accurate assessment.

Survey date: Mar 26, 2026 · Isolated — no actual harm with potential for more
F-0700
D
Try different approaches before using a bed rail
Minimal Harm

Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.

Survey date: Mar 26, 2026 · Isolated — no actual harm with potential for more
F-0804
E
Ensure food and drink is palatable, attractive, and at a safe and appeti…
Potential Harm

Ensure food and drink is palatable, attractive, and at a safe and appetizing temperature.

Survey date: Mar 26, 2026 · Pattern — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

9 citations on file
F-0321
E
Ensure that special areas are constructed so that walls can resist fire …
Potential Harm

Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.

Survey date: Mar 26, 2026 · Pattern — no actual harm with potential for more
F-0324
E
Provide properly protected cooking facilities
Potential Harm

Provide properly protected cooking facilities.

Survey date: Mar 26, 2026 · Pattern — no actual harm with potential for more
F-0355
E
Properly select, install, inspect, or maintain portable fire extinguishe…
Potential Harm

Properly select, install, inspect, or maintain portable fire extinguishes.

Survey date: Mar 26, 2026 · Pattern — no actual harm with potential for more
F-0521
E
Ensure heating and ventilation systems that have been properly installed…
Potential Harm

Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.

Survey date: Mar 26, 2026 · Pattern — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list
Facility
CMS
Risk %ile
Tier
WILLOWBROOKE COURT-SOUTHAMPTON
23.2 km · SOUTHAMPTON, PA
★★★★★
CMS
17th
Risk %ile
Lower risk
BUCKINGHAM VALLEY REHABILITATION AND NURSINGCENTER
22.6 km · BUCKINGHAM, PA
★★★★★
CMS
22th
Risk %ile
Lower risk
CHRIST'S HOME RETIREMENT COMMUNITY
24.4 km · WARMINSTER, PA
★★★★★
CMS
25th
Risk %ile
Lower risk