7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityLow

22th national percentile — 0.0% high-severity citations

ChronicityLow

18th national percentile — 1 repeat citations

Staffing integrityClean

None on file

Fire safetyElevated

5 citations

Weekend staffing dropElevated

71th national percentile — 18.4%

Contract staff shareLow

17th national percentile — 0.0%

Clinical trendModerate

38th national percentile — 1/5 measures worsened

Staffing gapAligned

Reported 4.52 vs expected 4.28 · +0.24 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

11 citations on file
F-0641
D
Ensure each resident receives an accurate assessment
Minimal Harm

Ensure each resident receives an accurate assessment.

Survey date: Aug 28, 2025 · Isolated — no actual harm with potential for more
F-0880
D
Provide and implement an infection prevention and control program
Minimal Harm

Provide and implement an infection prevention and control program.

Survey date: Aug 28, 2025 · Isolated — no actual harm with potential for more
F-0641
D
Ensure each resident receives an accurate assessment
Minimal Harm↻ Repeat

Ensure each resident receives an accurate assessment.

Survey date: Oct 1, 2024 · Isolated — no actual harm with potential for more
F-0695
D
Provide safe and appropriate respiratory care for a resident when needed…
Minimal Harm

Provide safe and appropriate respiratory care for a resident when needed.

Survey date: Oct 1, 2024 · Isolated — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

5 citations on file
F-0753
E
Have restrictions on the use of highly flammable decorations
Potential Harm

Have restrictions on the use of highly flammable decorations.

Survey date: Aug 28, 2025 · Pattern — no actual harm with potential for more
F-0921
F
Ensure that testing and maintenance of electrical equipment is performed…
Potential Harm

Ensure that testing and maintenance of electrical equipment is performed.

Survey date: Aug 28, 2025 · Widespread — no actual harm with potential for more
F-0291
F
Install emergency lighting that can last at least 1 1/2 hours
Potential Harm

Install emergency lighting that can last at least 1 1/2 hours.

Survey date: Oct 31, 2023 · Widespread — no actual harm with potential for more
F-0374
E
Install smoke barrier doors that can resist smoke for at least 20 minute…
Potential Harm

Install smoke barrier doors that can resist smoke for at least 20 minutes.

Survey date: Oct 31, 2023 · Pattern — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list

No other facilities with a lower realrating.care composite risk score in this radius.