7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityElevated

96th national percentile — 22.2% high-severity citations

ChronicityElevated

82th national percentile — 9 repeat citations

Staffing integrityClean

None on file

Fire safetyWatch

3 citations

Weekend staffing dropWatch

69th national percentile — 18.1%

Contract staff shareWatch

59th national percentile — 2.0%

Clinical trendModerate

38th national percentile — 1/5 measures worsened

Staffing gapAligned

Reported 3.21 vs expected 3.02 · +0.19 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

27 citations on file
F-0686
D
Provide appropriate pressure ulcer care and prevent new ulcers from deve…
Minimal Harm

Provide appropriate pressure ulcer care and prevent new ulcers from developing.

Survey date: Apr 10, 2026 · Isolated — no actual harm with potential for more
F-0880
D
Provide and implement an infection prevention and control program
Minimal Harm

Provide and implement an infection prevention and control program.

Survey date: Apr 10, 2026 · Isolated — no actual harm with potential for more
F-0695
D
Provide safe and appropriate respiratory care for a resident when needed…
Minimal Harm

Provide safe and appropriate respiratory care for a resident when needed.

Survey date: Mar 5, 2026 · Isolated — no actual harm with potential for more
F-0761
D
Ensure drugs and biologicals used in the facility are labeled in accorda…
Minimal Harm

Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs.

Survey date: Mar 5, 2026 · Isolated — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

3 citations on file
F-0321
E
Ensure that special areas are constructed so that walls can resist fire …
Potential Harm

Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.

Survey date: Oct 16, 2023 · Pattern — no actual harm with potential for more
F-0345
E
Have approved installation, maintenance and testing program for fire ala…
Potential Harm

Have approved installation, maintenance and testing program for fire alarm systems.

Survey date: Oct 16, 2023 · Pattern — no actual harm with potential for more
F-0353
E
Inspect, test, and maintain automatic sprinkler systems
Potential Harm

Inspect, test, and maintain automatic sprinkler systems.

Survey date: Oct 16, 2023 · Pattern — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list
Facility
CMS
Risk %ile
Tier
LAREDO MEDICAL CENTER
2.4 km · LAREDO, TX
★★★★★
CMS
40th
Risk %ile
Similar risk
La Frontera Nursing & Rehabilitation
2.5 km · Laredo, TX
★★★★
CMS
46th
Risk %ile
Similar risk
Las Alturas Nursing & Transitional Care
2.2 km · Laredo, TX
★★★★
CMS
47th
Risk %ile
Similar risk