7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityWatch

63th national percentile — 5.1% high-severity citations

ChronicityWatch

63th national percentile — 10 repeat citations

Staffing integrityClean

None on file

Fire safetyElevated

26 citations

Weekend staffing dropLow

28th national percentile — 12.7%

Contract staff shareLow

17th national percentile — 0.0%

Clinical trendElevated

70th national percentile — 2/5 measures worsened

Staffing gapWatch

Reported 3.87 vs expected 4.09 · −0.22 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

39 citations on file
F-0689
D
Ensure that a nursing home area is free from accident hazards and provid…
Minimal Harm

Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

Survey date: Mar 13, 2026 · Isolated — no actual harm with potential for more
F-0699
D
Provide care or services that was trauma informed and/or culturally comp…
Minimal Harm

Provide care or services that was trauma informed and/or culturally competent.

Survey date: May 29, 2025 · Isolated — no actual harm with potential for more
F-0880
E
Provide and implement an infection prevention and control program
Potential Harm

Provide and implement an infection prevention and control program.

Survey date: May 29, 2025 · Pattern — no actual harm with potential for more
F-0761
E
Ensure drugs and biologicals used in the facility are labeled in accorda…
Potential Harm

Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs.

Survey date: May 29, 2025 · Pattern — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

26 citations on file
F-0020
F
Establish policies and procedures including evacuation
Potential Harm

Establish policies and procedures including evacuation.

Survey date: May 29, 2025 · Widespread — no actual harm with potential for more
F-0041
F
Implement emergency and standby power systems
Potential Harm

Implement emergency and standby power systems.

Survey date: May 29, 2025 · Widespread — no actual harm with potential for more
F-0321
E
Ensure that special areas are constructed so that walls can resist fire …
Potential Harm

Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.

Survey date: May 29, 2025 · Pattern — no actual harm with potential for more
F-0345
C
Have approved installation, maintenance and testing program for fire ala…
Minimal Harm

Have approved installation, maintenance and testing program for fire alarm systems.

Survey date: May 29, 2025 · Widespread — no actual harm

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list

No other facilities with a lower realrating.care composite risk score in this radius.