7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityWatch

65th national percentile — 5.6% high-severity citations

ChronicityLow

13th national percentile — 1 repeat citations

Staffing integrityClean

None on file

Fire safetyElevated

7 citations

Weekend staffing dropModerate

34th national percentile — 13.5%

Contract staff shareModerate

49th national percentile — 0.7%

Clinical trendLow

10th national percentile — 0/5 measures worsened

Staffing gapAligned

Reported 3.53 vs expected 3.43 · +0.10 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

18 citations on file
F-0641
D
Ensure each resident receives an accurate assessment
Minimal Harm

Ensure each resident receives an accurate assessment.

Survey date: Jul 7, 2025 · Isolated — no actual harm with potential for more
F-0686
G
Provide appropriate pressure ulcer care and prevent new ulcers from deve…
Actual Harm

Provide appropriate pressure ulcer care and prevent new ulcers from developing.

Survey date: Jul 7, 2025 · Isolated — actual harm
F-0700
D
Try different approaches before using a bed rail
Minimal Harm

Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.

Survey date: Jul 7, 2025 · Isolated — no actual harm with potential for more
F-0880
D
Provide and implement an infection prevention and control program
Minimal Harm

Provide and implement an infection prevention and control program.

Survey date: Jul 7, 2025 · Isolated — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

7 citations on file
F-0521
E
Ensure heating and ventilation systems that have been properly installed…
Potential Harm

Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.

Survey date: Mar 26, 2025 · Pattern — no actual harm with potential for more
F-0712
F
Have simulated fire drills held at unexpected times
Potential Harm

Have simulated fire drills held at unexpected times.

Survey date: Mar 26, 2025 · Widespread — no actual harm with potential for more
F-0225
D
Have stairways and smokeproof enclosures used as exits that meet safety …
Minimal Harm

Have stairways and smokeproof enclosures used as exits that meet safety requirements.

Survey date: Jan 4, 2024 · Isolated — no actual harm with potential for more
F-0521
E
Ensure heating and ventilation systems that have been properly installed…
Potential Harm↻ Repeat

Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.

Survey date: Jan 4, 2024 · Pattern — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list

No other facilities with a lower realrating.care composite risk score in this radius.