7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityLow

22th national percentile — 0.0% high-severity citations

ChronicityLow

26th national percentile — 2 repeat citations

Staffing integrityClean

None on file

Fire safetyMinor

2 citations

Weekend staffing dropElevated

85th national percentile — 21.0%

Contract staff shareLow

17th national percentile — 0.0%

Clinical trendModerate

38th national percentile — 1/5 measures worsened

Staffing gapAligned

Reported 3.20 vs expected 3.02 · +0.18 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

16 citations on file
F-0656
D
Develop and implement a complete care plan that meets all the resident's…
Minimal Harm

Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured.

Survey date: Dec 30, 2025 · Isolated — no actual harm with potential for more
F-0802
F
Provide sufficient support personnel to safely and effectively carry out…
Potential Harm

Provide sufficient support personnel to safely and effectively carry out the functions of the food and nutrition service.

Survey date: Dec 30, 2025 · Widespread — no actual harm with potential for more
F-0880
E
Provide and implement an infection prevention and control program
Potential Harm

Provide and implement an infection prevention and control program.

Survey date: Dec 30, 2025 · Pattern — no actual harm with potential for more
F-0656
E
Develop and implement a complete care plan that meets all the resident's…
Potential Harm↻ Repeat

Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured.

Survey date: Sep 24, 2024 · Pattern — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

2 citations on file
F-0321
E
Ensure that special areas are constructed so that walls can resist fire …
Potential Harm

Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.

Survey date: Dec 30, 2025 · Pattern — no actual harm with potential for more
F-0511
E
Have properly installed electrical wiring and gas equipment
Potential Harm

Have properly installed electrical wiring and gas equipment.

Survey date: Dec 30, 2025 · Pattern — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list
Facility
CMS
Risk %ile
Tier
BANGS NURSING AND REHABILITATION
12.8 km · BANGS, TX
★★★★★
CMS
30th
Risk %ile
Lower risk