7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityElevated

92th national percentile — 17.1% high-severity citations

ChronicityModerate

38th national percentile — 6 repeat citations

Staffing integrityClean

None on file

Fire safetyElevated

5 citations

Weekend staffing dropModerate

49th national percentile — 15.4%

Contract staff shareModerate

48th national percentile — 0.6%

Clinical trendModerate

38th national percentile — 1/5 measures worsened

Staffing gapAligned

Reported 3.17 vs expected 3.03 · +0.15 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

35 citations on file
F-0656
K
Develop and implement a complete care plan that meets all the resident's…
Actual Harm

Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured.

Survey date: Aug 4, 2025 · Pattern — immediate jeopardy
F-0689
G
Ensure that a nursing home area is free from accident hazards and provid…
Actual Harm

Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

Survey date: May 16, 2025 · Isolated — actual harm
F-0600
J
Protect each resident from all types of abuse such as physical, mental, …
Actual Harm

Protect each resident from all types of abuse such as physical, mental, sexual abuse, physical punishment, and neglect by anybody.

Survey date: Sep 30, 2024 · Isolated — immediate jeopardy
F-0641
E
Ensure each resident receives an accurate assessment
Potential Harm

Ensure each resident receives an accurate assessment.

Survey date: Sep 30, 2024 · Pattern — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

5 citations on file
F-0355
F
Properly select, install, inspect, or maintain portable fire extinguishe…
Potential Harm

Properly select, install, inspect, or maintain portable fire extinguishes.

Survey date: Mar 28, 2024 · Widespread — no actual harm with potential for more
F-0372
E
Ensure smoke barriers are constructed to a 1 hour fire resistance rating…
Potential Harm

Ensure smoke barriers are constructed to a 1 hour fire resistance rating.

Survey date: Mar 28, 2024 · Pattern — no actual harm with potential for more
F-0355
E
Properly select, install, inspect, or maintain portable fire extinguishe…
Potential Harm↻ Repeat

Properly select, install, inspect, or maintain portable fire extinguishes.

Survey date: Feb 7, 2023 · Pattern — no actual harm with potential for more
F-0511
E
Have properly installed electrical wiring and gas equipment
Potential Harm

Have properly installed electrical wiring and gas equipment.

Survey date: Nov 10, 2021 · Pattern — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list
Facility
CMS
Risk %ile
Tier
Paradigm at the Prairies
20.6 km · El Campo, TX
CMS
53th
Risk %ile
Similar risk