7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityLow

22th national percentile — 0.0% high-severity citations

ChronicityLow

6th national percentile — 0 repeat citations

Staffing integrityClean

None on file

Fire safetyElevated

11 citations

Weekend staffing dropWatch

63th national percentile — 17.2%

Contract staff shareLow

17th national percentile — 0.0%

Clinical trendElevated

70th national percentile — 2/5 measures worsened

Staffing gapWatch

Reported 4.89 vs expected 5.02 · −0.13 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

12 citations on file
F-0628
D
Provide the required documentation or notification related to the reside…
Minimal Harm

Provide the required documentation or notification related to the resident's needs, appeal rights, or bed-hold policies.

Survey date: Mar 27, 2026 · Isolated — no actual harm with potential for more
F-0679
D
Provide activities to meet all resident's needs
Minimal Harm

Provide activities to meet all resident's needs.

Survey date: Nov 21, 2024 · Isolated — no actual harm with potential for more
F-0686
D
Provide appropriate pressure ulcer care and prevent new ulcers from deve…
Minimal Harm

Provide appropriate pressure ulcer care and prevent new ulcers from developing.

Survey date: Nov 21, 2024 · Isolated — no actual harm with potential for more
F-0688
D
Provide appropriate care for a resident to maintain and/or improve range…
Minimal Harm

Provide appropriate care for a resident to maintain and/or improve range of motion (ROM), limited ROM and/or mobility, unless a decline is for a medical reason.

Survey date: Nov 21, 2024 · Isolated — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

11 citations on file
F-0345
F
Have approved installation, maintenance and testing program for fire ala…
Potential Harm

Have approved installation, maintenance and testing program for fire alarm systems.

Survey date: Mar 27, 2026 · Widespread — no actual harm with potential for more
F-0111
F
Satisfy building requirements after a repair, renovation, modification, …
Potential Harm

Satisfy building requirements after a repair, renovation, modification, or change of user/occupancy.

Survey date: Nov 21, 2024 · Widespread — no actual harm with potential for more
F-0500
F
Meet other general requirements that are deficient
Potential Harm

Meet other general requirements that are deficient.

Survey date: Nov 21, 2024 · Widespread — no actual harm with potential for more
F-0712
F
Have simulated fire drills held at unexpected times
Potential Harm

Have simulated fire drills held at unexpected times.

Survey date: Nov 21, 2024 · Widespread — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list

No other facilities with a lower realrating.care composite risk score in this radius.