7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityLow

22th national percentile — 0.0% high-severity citations

ChronicityLow

18th national percentile — 1 repeat citations

Staffing integrityClean

None on file

Fire safetyElevated

20 citations

Weekend staffing dropWatch

54th national percentile — 16.0%

Contract staff shareLow

17th national percentile — 0.0%

Clinical trendModerate

38th national percentile — 1/5 measures worsened

Staffing gapWatch

Reported 3.08 vs expected 3.23 · −0.16 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

11 citations on file
F-0656
E
Develop and implement a complete care plan that meets all the resident's…
Potential Harm

Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured.

Survey date: Apr 18, 2024 · Pattern — no actual harm with potential for more
F-0698
D
Provide safe, appropriate dialysis care/services for a resident who requ…
Minimal Harm

Provide safe, appropriate dialysis care/services for a resident who requires such services.

Survey date: Apr 18, 2024 · Isolated — no actual harm with potential for more
F-0812
F
Procure food from sources approved or considered satisfactory and store,…
Potential Harm

Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards.

Survey date: Apr 18, 2024 · Widespread — no actual harm with potential for more
F-0880
F
Provide and implement an infection prevention and control program
Potential Harm

Provide and implement an infection prevention and control program.

Survey date: Apr 18, 2024 · Widespread — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

20 citations on file
F-0004
C
Develop and maintain an Emergency Preparedness Program (EP)
Minimal Harm

Develop and maintain an Emergency Preparedness Program (EP).

Survey date: Apr 18, 2024 · Widespread — no actual harm
F-0161
E
Use approved construction type or materials
Potential Harm

Use approved construction type or materials.

Survey date: Apr 18, 2024 · Pattern — no actual harm with potential for more
F-0345
F
Have approved installation, maintenance and testing program for fire ala…
Potential Harm

Have approved installation, maintenance and testing program for fire alarm systems.

Survey date: Apr 18, 2024 · Widespread — no actual harm with potential for more
F-0346
F
Follow proper procedures when the fire alarm was out of service for more…
Potential Harm

Follow proper procedures when the fire alarm was out of service for more than 4 hours.

Survey date: Apr 18, 2024 · Widespread — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list

No other facilities with a lower realrating.care composite risk score in this radius.