7Risk Axes

National percentile · lower = less risk · staffing gap is context only (not in composite)

How we calculate
SeverityElevated

86th national percentile — 12.5% high-severity citations

ChronicityLow

6th national percentile — 0 repeat citations

Staffing integrityClean

None on file

Fire safetyElevated

5 citations

Weekend staffing dropModerate

31th national percentile — 13.1%

Contract staff shareLow

17th national percentile — 0.0%

Clinical trendLow

10th national percentile — 0/5 measures worsened

Staffing gapAligned

Reported 4.70 vs expected 3.70 · +1.00 hr/res/day

Recent Health Violations

Health inspection citations from official Medicare records

8 citations on file
F-0604
E
Ensure that each resident is free from the use of physical restraints, u…
Potential Harm

Ensure that each resident is free from the use of physical restraints, unless needed for medical treatment.

Survey date: Jan 24, 2024 · Pattern — no actual harm with potential for more
F-0680
F
Ensure the activities program is directed by a qualified professional
Potential Harm

Ensure the activities program is directed by a qualified professional.

Survey date: Jan 24, 2024 · Widespread — no actual harm with potential for more
F-0689
J
Ensure that a nursing home area is free from accident hazards and provid…
Actual Harm

Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

Survey date: Jan 24, 2024 · Isolated — immediate jeopardy
F-0700
E
Try different approaches before using a bed rail
Potential Harm

Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail.

Survey date: Jan 24, 2024 · Pattern — no actual harm with potential for more

Recent Fire Safety Violations

Fire safety inspection citations from official Medicare records

5 citations on file
F-0291
F
Install emergency lighting that can last at least 1 1/2 hours
Potential Harm

Install emergency lighting that can last at least 1 1/2 hours.

Survey date: Sep 25, 2024 · Widespread — no actual harm with potential for more
F-0293
F
Have properly located and lighted "Exit" signs
Potential Harm

Have properly located and lighted "Exit" signs.

Survey date: Sep 25, 2024 · Widespread — no actual harm with potential for more
F-0362
E
Ensure that corridors are separated from use areas by walls constructed …
Potential Harm

Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.

Survey date: Sep 25, 2024 · Pattern — no actual harm with potential for more
F-0321
E
Ensure that special areas are constructed so that walls can resist fire …
Potential Harm

Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.

Survey date: Sep 22, 2022 · Pattern — no actual harm with potential for more

Better Nearby Options

Within 25 km · sorted by overall risk percentile

Full nearby list

No other facilities with a lower realrating.care composite risk score in this radius.